301-926-2256 [email protected]

Road Resurfacing RFP:

TC Minutes – December 2018 / Mayor Compton opened the sealed bids received from A.B. Veirs and M.T. Laney. Discussion included the following: Paving all or part of Ridge Road Planning ahead for more costly segments Splitting the job between the bidders...

Speed Bumps – Signage

TC Minutes – November 2018 / Safety issues were raised concerning the lack of signage for the trial, temporary speed bumps. Bump signs have been installed at the STOP signs where the bumps are located and warning signs will be installed ahead of the bumps....
Scroll Up