Removed old tile floor in Town Hall kitchen and installed new floor tile.
Removed the sink and old shut off valves.
Installed new kitchen cabinets and new shut off valves.
Went to Alpine Counter-top to look at options for the kitchen.
Measured hallway and bathroom floors for new floors, purchased flooring tile ready for installation.
Installed cabinet door pulls.
Cut flower beds in Morgan Park; Circle and mulched beds.
Picked up lumber for fencing around Town Hall Generator. Cut and stained boards for generator fence, installed boards and post caps.
Cut fallen trees in the East Woods.
Dug drainage ditch on Acorn Lane, installed drainage pipe; gravel and back filled soil.