301-926-2256 [email protected]


Cherry Avenue: Steve Werts and helpers have installed a new drainage pipe across Cherry Avenue (near Center Street) to improve stormwater runoff across the walkway. The Avenue will be further leveled by Spring, and hopefully this will solve the long-standing drainage problem that left Cherry muddy and impassable due to standing water.

Scroll Up